Page 34 - ADT APRIL - MAY 2021 Online Magazine
P. 34

Disconnected Operations – It’s Data                            IFS has achieved exactly this with its
        Dependent                                                      Disconnected Operations functionality unveiled
        Re-syncing information such as engineering & maintenance data,   at the launch of IFS Cloud.
        technical records and more may sound simple, but this is a very   The solution supports data aggregation, trans-
        difficult task to manage from a data architecture perspective. While   fer and analysis between an MOB and FOB to   [ COLUMN ]
        aircraft or vehicle systems will usually be connected for 99 per   deliver in three core ways:
        cent of the time, data inconsistency is probable during the 1 per
        cent of time they may spend disconnected. Without consistent  1. Asset Compliance and
        information on what has taken place during a mission, the MOB  Baseline Updates
        cannot gain a single version of the truth on the asset’s status and  Supporting software should be able to address
        availability—limiting a commander’s decision capability. This applies  the core requirement needed to transfer assets
        to many military assets, including naval equipment which commonly  between nodes, including asset transfers and
        operates at huge scale and in disconnected environments. This  baseline  and  records  transfers.  Workflow
        scale is only set to increase, as U.S. Navy plans highlight a force-  management functionality  should prepare
        level goal for an even more distributed fleet architecture.    deployments and imports of assets from MOBs
                                                                       to FOBs and vice versa.

                                                                       2. Technical Records Repository
                                                                       When technical records are created in multi-
                                                                       ple internal or external systems, command or
                                                                       central maintenance management requires an
                                                                       aggregated view to make and confirm tacti-
                                                                       cal capability decisions. A Technical Records
                                                                       Repository (TRR) should enable access to the
                                                                       full set of historical records for maintenance
                                                                       performed and usage accrued on an aircraft
                                                                       or component.

                                                                       With a reliable, and up-to-date TRR, the CEA
                                                                       can put trust in the data that is being fed back
        Data Exchange Must Work Both Ways                              to them from the field – resulting in a feedback
        But information exchange must be two-way. Equipment updates    loop with central command to accurately deter-
        from a MOB will need to be received by FOB personnel, and assets   mine force-wide availability and operational
        come with an allowable baseline configuration, which change and   readiness.
        update regularly. In defence operations, the Central Engineering
        Authority (CEA) creates and maintains the maintenance and equip-  3. Extending the Core
        ment baselines, and baselines at autonomous bases must remain  Maintenance System to Deliver
        up-to-date.                                                    “Anywhere Operations”
                                                                       This functionality should be fully integrated
        Changes to allowable configuration or critical technical bulletins  into core maintenance management software,
        must be ‘pushed’ outwards to all operational nodes and certain  eliminating the need for data duplication. This
        airworthiness updates may directly impact an individual aircraft’s  integration delivers a complete spectrum of
        safety and ability to carry out a mission so, accessibility for front  military equipment maintenance management
        line personnel is integral. Keeping Total Asset Readiness achievable  in a single integrated business platform.
        despite connectivity challenges lies within the “quality” of this data
        and the timely, accurate information offered by a two-way data  Total Asset Readiness
        exchange will in turn, render into better strategic decision-making. Maintained at all Times
                                                                       Carrying out disconnected operations requires
        Purpose-Built Software Required to Support                     a sophisticated underlying software architec-
        Three Critical Focus Areas                                     ture that will protect military operations during
        Military operators require purpose-built software to address the  critical moments of service. With the right
        unique challenges of operating from remote and austere environ-  software infrastructure, military organizations
        ments. A containerized software architecture is key, and involves  can be confident that Total Asset Readiness
        bundling an application together with all the related configuration  can be achieved and that a consistent picture
        files, libraries and dependencies required to run efficiently across  for all commanders, frontline personnel and
        different environments. Containerization meets the challenges  maintenance centers on the status of available
        of scale, rapid deployability and being self-contained as secure,  equipment is available, regardless of connec-
        standalone software.                                           tivity interruptions.


        34 | April/May 2021                                                        WWW .GBP .COM.SG/ ADT
   29   30   31   32   33   34   35   36